AMERICAN MANUFACTURING   /   NORTH CAROLINA DELIVERYNEW EQUIPMENT   •   BUILT TO SPEC
Built in America. Delivered to North Carolina.

Automatic Transfer Switch Integration

New equipment, practical engineering and direct manufacturer support for North Carolina projects. Ask about short lead times.

Gray electrical switchgear beneath overhead conduits in an industrial room.
Illustrative switchgear photography
USAMade in America
American components
UL
891
UL 891 switchboards
where specified
01Custom built
to your specifications
NCNorth Carolina service
nationwide shipping

Consider electrical and mechanical interfaces between transfer switches, distribution equipment, source controls, and upstream protection. The equipment selection should follow the actual source characteristics, connected loads, operating requirements and installation environment. We manufacture new power distribution equipment in the United States and serve customers across North Carolina. Tell us what is known about the one-line, desired configuration and target delivery schedule. A project review establishes the proposed scope and identifies ratings or documentation that need confirmation.

Automatic Transfer Switch Integration — project planning

An automatic transfer switch selects between normal and alternate sources according to the project's transfer sequence. Define source voltages, phase rotation, load current, generator starting signals, retransfer settings and whether open-transition or another transfer method is needed. The engineer should determine whether the neutral is switched based on the grounding arrangement and applicable requirements. Check the switch's withstand and closing rating against available fault current from each source, the specified upstream protection and applicable time limitations. Identify any service-entrance use and request documentation for the specified equipment standard, such as UL 1008.

Control and metering wiring connects devices such as relays, switches, indicators, and instrument transformers to the functions shown on the project drawings. Conductor size, insulation, terminal selection, and routing should reflect circuit ratings and the installation environment. Labels at both ends make circuits easier to trace during startup and future maintenance. Separation and mechanical support can reduce interference and protect wiring from sharp edges or moving parts. Particular care is needed with current transformer secondary circuits: their connections and test procedures must follow the equipment instructions and applicable safety practices.

Commissioning: Coordinating the Site Interfaces

Commissioning brings the equipment and the wider installation together through a planned sequence of checks before service. The project team should confirm anchorage, accessible clearances, cable terminations, grounding, section splices, and control connections against the drawings and installation instructions. Utility interfaces, protective device settings, and remote signals may require coordination with other parties. Responsibilities for tests, documentation, and energization should be established in advance. Work on electrical equipment must follow applicable safety requirements, including deenergization, lockout or tagging, and verification of the deenergized condition where required.

Utility-facing switchgear projects require early coordination over the boundary between the utility system and customer-owned distribution. The procurement package should identify the point of connection, incoming source characteristics, metering arrangements, protection responsibilities, and the information needed for the utility's review. Show current and voltage transformer locations where applicable, along with communication and control interfaces. Confirm assumptions about available fault current and future system changes with the responsible parties. Clear ownership and operating responsibilities help avoid gaps when equipment is commissioned, switched, or maintained.

Retrofits: New Equipment for an Existing System

A retrofit project may call for new equipment that connects to an existing electrical system while respecting established building constraints. Useful starting information includes current single-line drawings, available fault current, feeder sizes, connection locations, and the physical route into the room. Existing records should be checked against verified site conditions because past modifications may not appear on drawings. The new assembly's ratings and interfaces must be evaluated for the intended installation. Outage sequencing and the boundaries between the new equipment and existing infrastructure should be agreed with the project team.

Neutral and grounding arrangements affect the equipment design as well as the installation. Identify the system configuration, neutral conductor needs, ground bus, service or feeder application, and any ground-fault protection requirements. The electrical engineer should specify where neutral-to-ground bonding is required and where the neutral must remain isolated, using the adopted code and the actual source configuration. Transformers and generator transfer arrangements can introduce separately derived system questions. Provide these details before drawings are approved, and do not assume that a bonding arrangement suitable at one location is appropriate everywhere downstream.

Project Drawings and Submittals

Clear drawings help a switchgear supplier and the design team resolve interfaces before equipment is released for fabrication. Include a current one-line diagram, source information, feeder schedule, short-circuit study assumptions when available, and the intended control and metering functions. Physical drawings should identify room dimensions, cable entry, equipment clearances, and relevant obstructions. Request submittals that show lineup arrangement, connection details, device functions, and proposed departures from the specification. Review comments should be reconciled with the engineer of record and other affected trades before fabrication proceeds.

A project-specific equipment layout connects electrical requirements to the space available for installation and maintenance. Section dimensions, cable entry, conductor bending space, ventilation, and access to operating devices all influence the arrangement. The design should account for doors, removable covers, lifting provisions, and the working clearances required at the installed location. Coordination with the building team helps identify obstructions, floor loading, and the route into the electrical room. A documented layout also makes it easier to review future expansion without assuming unused space is automatically suitable for additional equipment.

Shipment: Preparing Equipment for Installation

Shipment planning considers the size, weight, center of gravity, and handling needs of each equipment section. A lineup may be divided into shipping sections when required by transportation limits or the path into the building. Documentation should identify section order, loose components, splice materials, and any handling or storage instructions supplied with the equipment. Packaging and protection should reflect the expected transit and storage conditions without assuming the enclosure alone is adequate for outdoor storage. On arrival, the receiving team should inspect for damage and document discrepancies before installation.

A useful switchgear design starts with the electrical system, not the enclosure dimensions alone. The project team establishes nominal voltage, frequency, phase configuration, grounding method, expected loads, and available fault current at the installation point. These inputs guide equipment ratings, protective device selection, and the arrangement of incoming and outgoing circuits. Future feeders or alternate sources should be identified early because they can affect bus capacity and layout. The final design must also reflect the applicable codes, the site conditions, and the ratings of the complete assembly.

PROJECT CHECKLIST

Start with the right specifications

Final capabilities and ratings are confirmed against the application, approved drawings and quotation.

Project detailWhat to provide
SystemVoltage, phase, wiring and grounding
CurrentMain and feeder ratings; load information
ProtectionAvailable fault current, SCCR and protective device requirements
InstallationEnclosure, space, utility requirements and destination
From specification to shipment

Let's build the right lineup.

Share your one-line, project requirements and delivery location. We'll discuss the next step.

Call (951) 403-5738 →
Request a Quote →